12
Remove the location pins of the four square tube members of the BGW, use the lifting device to adjust the height
of the BGW to the size of the shell plate. Relock the location pins when the appropriate position (pin holes) is
found and apply a locking pin to secure the location pin at the appropriate pin holes on the square tubes.
These pin holes are drilled at an interval of 4'' (100mm).
Set the separator tank on the roof and connect the flux hoses. Extra flux hose line is required to be added to the
installed hose when setting the machine for a higher shell plate. Except the models with flux recovery sys-
tems fixed right on top of the operator platform.
Adjust drive wheels of the travel mechanism to the diameters of the tank, then lock them into position.
Fig. Square tub mechanism
Brief Introduction of Lifting Frame
1.
Lifting mechanism adopts inside and outside annular
tube structure which can complete in adjusting the
length of frame by fixing or releasing location pin.
2.
Release the holddown screw of the lower bracket at
first and then take down active floor at holddown.
3.
Draw out forelock of location pin and then drop out
location pin.
4.
Adjust the length of the frame according to the length
of the shell.
5.
Plug into forelock stretch.
6.
Install holddown and wind up screw to eliminate
the gap.
Upper Bracket
Lift Post
Hold Down
Compressed
Mounting
Bracket
Stretch Stick
Location Pin
Lower Bracket
Forelock
Holddown