Placing the heating system in operation
9
45
Änderungen aufgrund technischer Verbesserungen vorbehalten!
Installation and maintenance instructions Logano GA124 special gas-fired boiler • Ausgabe 04/2005
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
9.5
Instruct owner/operator and hand over technical documentation
Inform the owner/operator of the operation of the
complete heating system and the operating instructions
for the boiler. Together with the owner sign the protocol
on page 46 and hand over the technical documentation.
CAUTION!
SYSTEM DAMAGE
due to frost.
The heating system may freeze in frosty
conditions if the control is not switched on.
z
Protect the heating system from
freezing when there is a danger of frost.
z
When the main switch or control is
switched off, drain the water from the
boiler, the tank and the pipes of the
heating system.