58
Installation and maintenance instructions Logano GA124 special gas-fired boiler • Issue 04/2005
We reserve the right to make any changes due to technical modifications.
Boiler inspection and maintenance
11
START
Room thermostat (control) signals heat requirement
Fan starts.
Ignition spark generator operates
• ignition gas valve opens.
With steady ignition flame
• ignition spark generator stops.
• main gas solenoid valve opens.
Main burner operation
• S 8600 H monitors ignition flame.
Specified thermostat value (control) reached
Main and ignition gas valves close, gas burners go
out. Venting fan stops.
Ignition burner operation
Ignition flame burns, S 8600 H
signals steady ignition flame
or
ignition flame does not burn, S
8600 H starts ignition attempt,
switches off after 90 seconds.
END
PHASE 1
Ignition attempt
PHASE 2
Main burner
operating
Power interruption
system switches off. Does
system switch on again
when power is restored?
Ignition flame fault
Main gas valve closes,
S 8600 H starts ignition
attempt.