7
Boiler block assembly
Logano G315 – 6 720 817 939 (2017/02)
22
▶ Push rear section thermal insulation (Fig. 35, [2]) onto the flue
outlet. The cut-out for the boiler flow and boiler return must point
upwards.
▶ Hook the rear section thermal insulation to the top rear crosswise tie
bar with two spring hooks (Fig. 35, [1]).
▶ Close the slot below the flue outlet with spring hooks (Fig. 35, [3]).
Fig. 35 Fitting the rear section thermal insulation
▶ Push the front thermal insulation (Fig. 36, [1]) with slots (Fig. 36,
[2]) onto the front folded edge of the top crosswise tie bar.
Fig. 36 Fitting the front thermal insulation
7.9.3
Fitting side panels and top covers
▶ Attach side panel (Fig. 37, [1]) with the cut-outs into the slots of the
top connection plates (Fig. 37, [2]) and push forwards as far as it will
go.
▶ Screw the side panels at the bottom to the bottom profile rails using
two self-tapping screws in each case (Fig. 37, [3]).
Fig. 37 Fitting the side panels
▶ Place front cover (Fig. 38, [1]) between the side panels so the cut-
out (Fig. 38, [3]) fits over the tie bar.
▶ Screw the rear cover to the side panels using one self-tapping screw
Fig. 38 Fitting the front cover
6 720 642 621-29.1o
2
3
1
6 720 642 621-30.1o
1
2
3
4
Before fitting the other parts of the cover, you must first
install the control panel, route the capillary tubes to the
sensor well and insert the sensor into the sensor well
(
6 720 642 621-31.1o
1
2
3
6 720 642 621-32.1o
1
2
3