Boiler block assembly
Logano G315 – 6 720 817 939 (2017/02)
12
If you do not observe the recommended minimum clearance (
you will not be able to use the cleaning kit (accessory). Alternatively
shorter cleaning devices or wet cleaning may be used.
6.3
Installing the boiler on a boiler base or foundation
When setting up the boiler, we recommend you observe the specified
wall clearances for improved installation and maintenance (
It is advisable to place the boiler on a 2 – 4 inch (50 – 80 mm) tall base
(
Fig. 6, [1]). The base should be completely flat and level. The front
edge of the boiler should be flush with the edge of the base.
A concrete foundation can be constructed on-site. When building the
foundation, a 3 15/16 x 1 31/32 x 5/16 inches (100 x 50 x 8 mm) steel
angle or 3 15/16 x 13/64 inches (100 x 5 mm) steel flat should be
incorporated (
Fig. 6
Base dimensions
7
Boiler block assembly
Fig. 7
Boiler heat exchanger
[1]
Boiler base or foundation
[2]
Draining
[3]
Exhaust Manifold
[4]
Rear section
[5]
Return connection
[6]
Supply connection
[7]
Intermediate sections
[8]
Tie rod
[9]
Directional arrow
[10] Front section
[11] Burner door with burner plate
Depending on the type of delivery, we distinguish between delivery
unassembled and as a
ready assembled block
. When delivered as a
ready-assembled block, the boiler is assembled and checked for leaks
prior to despatch. If, because of physical limitations, a boiler block
cannot be assembled as a complete unit, delivery unassembled would
enable assembly on site.
For
details of assembling the remainder of the boiler if the heat
exchanger is delivered pre-assembled
, see
Boiler capacity
Clearance A in inches (mm)
MBH (kW)
Boiler sections
Recommended
Minimum
358 – 686
(105 – 230)
5 – 9
59 (1500)
39-3/8 (1000)
Table 8
Number of boiler
sections
L1
(base)
in inch (mm)
L2
(steel section)
in inch (mm)
5
38-3/16 (970)
28-3/4 (730)
6
44-31/64 (1130)
35-1/32 (890)
7
50-25/32 (1290)
41-21/64 (1050)
8
57-3/32 (1450)
47-41/64 (1210)
9
63-25/64 (1610)
53-15/16 (1370)
Table 9 Foundation dimensions and lengths of steel flats or steel angles
6 720 642 621-01.1o
L
2
(540 mm)
(~ 90 mm)
(100 mm)
(~ 880 mm)
(~ 50...80 mm)
2...4"
L
1
34 3/4"
1
3 1/2"
4"
21 1/4"
(100 mm)
4"
WARNING:
Risk of injury from improperly secured
boiler sections.
▶ Use only suitable means of transportation when
handling the boiler sections, e.g. a heavy duty hand
truck. When handling, secure the boiler sections to
the means of transport to prevent them slipping.
6 720 642 621-03.1o
2
1
3
4
5
6
8
8
7
9
11
10