Index
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
59
Index
A
Ambient conditions
...............................................
11
B
Boiler output
........................................................
10
Boiler room
..........................................................
11
Boiler type
...........................................................
10
C
Cleaning the hot gas flues
.....................................
52
Combustion air supply
..........................................
12
Combustion chamber
............................................
52
Commissioning
....................................................
45
Connecting the central heating flow and return
.......
39
Connections
........................................................
10
D
DHW cylinder connection
......................................
40
Dimensions
..........................................................
10
Dirt trap
..............................................................
39
F
Filling the heating system
......................................
41
Fitting boiler fill and drain valve
.............................
40
Flow temperature
.................................................
10
Flue pipe sealing collar
.........................................
38
Fuel connection
....................................................
42
Fuel, operating conditions
.....................................
12
H
Heating system emergency stop switch
..................
50
I
Installing the burner hood
.....................................
48
Installing the control unit
......................................
42
L
Leaks, checking for (primary circuit)
......................
41
M
main shut-off valve
...............................................
46
Mains power connection
.......................................
43
Mains power supply
..............................................
13
Mains supply
........................................................
13
O
ON/OFF switch
....................................................
50
Operating pressure
...............................................
13
Operating pressure, permissible
............................
10
P
Pressure gauge
....................................................
45
Pressure/temperature gauge
.................................
54
R
Rated output
........................................................
10
Removing the hot gas baffle plates
.........................
52
Replacing the packing cord
....................................
52
Report, commissioning
..........................................
49
Reports, inspection and maintenance
.....................
55
S
Safety
....................................................................
4
safety flow, connecting
.........................................
40
Safety Instructions
.................................................
4
Servicing, regular
..................................................
51
Shutting down
.....................................................
50
T
Technical Data
.....................................................
10
Temperature/pressure gauge
............................
45
,
54
W
Wall clearances
....................................................
15
Water quality
.......................................................
13
Water, topping up
.................................................
54
Wet cleaning
........................................................
53