5
Boiler block assembly
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
37
V
Push the heat shield onto the insulating shells.
Fig. 51 Installation of the heat shield
5.5
Positioning and levelling the boiler
V
Move the boiler into its final location.
V
Level the boiler by inserting the adjustable feet uo or
down as required and using a spirit level.
Fig. 52 Levelling the boiler horizontally
6 720 615 876-51.1RS
Protect boiler connections from damage and
dirt if the boiler is not to be installed
immediately.
7 747 019 141-11.1RS