5
Boiler block assembly
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
16
5
Boiler block assembly
The on-site installation is carried out using individual
sections if, because of physical limitations, a boiler block
cannot be handled as a complete unit.
For details of assembling the remainder of the boiler if the
heat exchanger is delivered pre-assembled,
Æ
Chapter 5.4, page 28.
Fig. 4
Fully assembled boiler heat exchanger
1
Foundation/installation location
2
Drain
3
Rear section
4
Flue outlet
5
Connecting block
6
Centre sections
7
Anchor rods
8
Front section
9
Burner door
5.1
Assembly when delivered in
sections
V
Assemble all boiler sections in accordance with the
following instructions and illustrations.
5.1.1
Preparation of boiler sections
V
Lay rear section [2] across two wooden battens [3].
V
Clean the boiler bosses [1] with emery paper and a rag.
V
Remove any burrs which might have been created with
a file.
V
Clean the joint lip/groove [4] using a wire brush and
rag.
Fig. 5
Filing off flash
1
Boiler bosses
2
Rear section
3
Wooden battens
4
Joint lip
Warning: Risk of injury if load is
inadequately secured during transportation.
V
Use suitable means of transportation, e.g.
the Buderus boiler hand truck with strap.
V
Secure the load against falling.
6 720 615 876-04.1RS
1
2
3
4
5
6
7
8
7
9
Warning: Health risk and risk of injury from
release of vapours and easily combustible
cleaning agents.
V
Ensure adequate ventilation inside the
boiler room when using red lead putty,
adhesives and cleaning agents.
V
When using a cleaning agent, avoid naked
flames, glowing embers and sparks.
V
Observe the manufacturer's handling and
safety instructions.
6 720 615 876-05.1RS
3
4
1
1
2