50
Installation and maintenance instructions Logano G124X II/SP special gas-fired boiler • Issue 04/2005
We reserve the right to make any changes due to technical modifications.
Boiler inspection and maintenance
13
START
Room thermostat (control) signals heat requirement
Vent Damper (if installed) opens.
Ignition spark generator operates
• ignition gas valve opens.
With steady pilot flame
• ignition spark generator stops.
• main gas solenoid valve opens.
Main burner operation
• ignition module monitors pilot flame.
Specified thermostat value (control) reached
Main and ignition gas valves close, gas burners
extinguished, Vent Damper (if installed) closes.
Pilot burner operation
Pilot flame burns, ignition module
signals steady pilot flame.
or
ignition flame does not burn,
ignition module starts ignition
attempt,
switches off after 90 seconds.
END
PHASE 1
Ignition attempt
PHASE 2
Main burner
operating
Power interruption
System switches off. Does
the system restart when
power is restored?
Pilot flame fault
Main gas valve closes,
ignition module starts new
ignition attempt.