32
Installation and maintenance instructions Logano G124X II/SP special gas-fired boiler • Issue 04/2005
We reserve the right to make any changes due to technical modifications.
Placing the heating system in operation
11
11.2.2 Placing heating system with Logamatic 2107
(accessory) in operation
The boiler is fully functional with the factory-installed
aquastat. The Logamatic 2107 control can also be
installed in addition to the factory-installed aquastat.
Turn on the heating system with the ON/OFF switch on
the control. The burner starts operating if heat is
required (
Î
observe control service manual).
5.
Make sure that heat is required at the control. Select
"Manual operation" (hand symbol) with the mode
selector switch.
6.
Turn on ON/OFF switch ("I" position). Then continue
with step 7 (G124X II) or step 35, page 36
(G124X SP).
11.3 Conducting final commissioning for G124X II boiler
The final commissioning for the G124X SP boiler is
described in (
The following start-up procedures must be carried out
regardless of the control type.
7.
Look at the pilot burner through the sight glass in the
burner housing.
Fig. 28
Turning on heating system (with Logamatic 2107
control)
1
Mode selection switch
2
ON/OFF switch
2
1
USER NOTE
After carrying out the instructions for
starting described below, the control must
be set to "AUT" mode (automatic
operation) with the mode selector.
Fig. 29
G124X II boiler
1
Sight glass
1