Boiler installation
7
13
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G124X II/SP special gas-fired boiler • Issue 04/2005
7
Boiler installation
This chapter describes how to install the boiler. This
includes the following tasks:
–
Connecting the heating system
–
Electrical connection
–
Fuel supply connection
7.1
Preparing for installation
z
Unpack all boxes and containers and check all parts
against the packing lists to make sure that everything
has been supplied.
USER NOTE
Every boiler is carefully inspected and
tested before it leaves the factory.
However, if you discover any damage or
missing parts, please inform the supplier
immediately. Before disposing of packing
material, make sure that no parts are still
in it.