40
Installation and maintenance instructions Logano G124X II/SP special gas-fired boiler • Issue 04/2005
We reserve the right to make any changes due to technical modifications.
Placing the heating system in operation
11
11.5 Shutting off gas supply to boiler
1.
Set thermostat to the lowest value.
2.
Disconnect heating system from the power supply
before carrying out maintenance work.
3.
Remove front panel of boiler.
4.
Turn gas valve ON/OFF button clockwise to OFF
position. Do not use force.
5.
Replace front panel of boiler.
Fig. 39
Remove front panel of boiler
Fig. 40
Gas valve (G124X II left, G124X SP right)
1
ON/OFF button (at ON position)
1
1