Inspection
12
Installation instructions Logamax plus GB142-24/30/45/60 • version 10/2007
47
We reserve the right to make any changes due to technical modifications!
Buderus • http://www.buderus.net
12 Inspection
We advise you to offer your customer an annual inspection
and maintenance contract (for the contents of this contract,
see page 59 and page 60).
If inspection reveals that maintenance work is necessary
you can carry this out as required (see chapter 13 "Mainte-
nance", page 49).
z
Periodically examine the venting systems and cleaning
of the screens in the vent terminal.
z
Also periodically inspect the low water cutoffs, including
flushing of float types and clean the condensate collec-
tions and disposal system.
12.1 Preparing the boiler for inspection
z
Switch off the heating system using the main switch.
z
Remove the cover from the boiler (fig. 7, page 13).
12.2 Visual inspection for general signs of
corrosion
z
Check all gas and water pipes for signs of corrosion.
z
Replace any pipes that are corroded.
CAUTION
– Check and clean the heating system once a
year.
– Carry out a maintenance overhaul if
necessary. Immediately repair defects to
avoid damage to the heating system!
WARNING
Do not use this boiler if any part has been under
water. Immediately call a qualified service tech-
nician to inspect the boiler and to replace any
part of the control system and any gas control
which has been under water.
CAUTION
Risk of electric shock.
– Before opening the system:
disconnect the heating system from the
power supply using the heating system
emergency OFF button or disconnect the
relevant circuit breaker of the house from the
power grid.
– Secure the heating system against
accidental restarting.
INSTRUCTION FOR THE INSTALLER
– If gas pipes have to be disconnected from the
gas burner fitting, the burner cover must only
be opened by a specialized professional.