Installation and Connections
MATRIX CUBE
- 23 -
2) Thread up yarn into the DIAPER FEEDER device as indicated on the following figure:
2a - Insert the yarn into the yarn way sheave (P1)
2b - Set the yarn to the right of the black pretension ceramic bar (P2)
2c - Make 3 coils around the DIAPER FEEDER device wheel (clockwise direction)
2d - Thread the yarn over the loading cell of TS44.. tension sensor
2e - Thread the yarn on the wheel (R1)
If necessary, you may ad just the coil separator following the procedure described on paragraph
5.1.3 Coil separator adjustment (Section 5)
Yarn way sheave (P1)
Black ceramic bar (P2)
TS44..
Wheel (R1)
Summary of Contents for MATRIX CUBE
Page 1: ...MATRIX CUBE Operating Manual ENGLISH Rev 4 2 April 2014 ...
Page 3: ...Introduction i ...
Page 4: ......
Page 10: ...Introduction MATRIX CUBE vi Page intentionally left blank ...
Page 13: ...Installation and Connections 1 ...
Page 14: ......
Page 40: ...Installation and Connections MATRIX CUBE 26 Page intentionally left blank ...
Page 41: ...Operating Instructions 2 ...
Page 42: ......
Page 87: ...Error Messages 3 ...
Page 88: ......
Page 91: ...DIAPER FEEDER Device 4 ...
Page 92: ......
Page 117: ...Maintenance of MATRIX CUBE System 5 ...
Page 118: ......
Page 123: ...Sign Off A ...
Page 124: ......
Page 128: ...Sign Off Procedure at System Reception MATRIX CUBE 104 Page intentionally left blank ...