BRUGG Rohrsysteme GmbH ·- Adolf-Oesterheld-Str. 31 - D-31515 Wunstorf
Tel.: +49 (0) 5031 170-0 Fax: +49 (0) 5031 170-170 e-mail: [email protected]
page 6 of 11
Before welding
At the beginning of a day all joint and building-site-specific data has to be entered
into the machine. For all welding processes on the same day it is then only still
necessary to specify the joint number and, if necessary, the welding section. All the
other data only has to be confirmed with OK and can be changed, if necessary, after
pressing the C key.
Control panel of the CAW 04