Operating Instructions 125 MAX DD2
Seite/page 61/100
Ausgabe/edition 01/2006
S
Warning: During kart operation beware of any contact of body or clothing with moving
parts of the kart (rear axle, brakes, wheels…). Risk of injury.
Fig. 6
6.2. Direct attachment of the engine on chassis
If the frame of the chassis is specially prepared for installation of the Rotax 125 MAX DD2 then 2
sheet metal brackets with holes are welded on to the two frame tubes. Between the two brackets
the engine is clamped with 4 bolts.
¨
Mount engine directly on the brackets
¡
Note:
Alignment of engine is not necessary, this is done automatically by the two brackets.
¡
Note:
Engaged thread length in crankcase should be between16 – 24 mm (0,6 – 0,95 in)
S
Warning: For engine suspension to the chassis pleas follow the instruction of the
chassis manufacturer.
7. Fitting of the start button and of ON/OFF switch
Both items have to be fitted either right or left into top section
of the front shield where the best possible protection against
dampness is provided.
¨
Drill 22 mm (0,86 in) dia. hole for the
starter button (2) into either left or right
side of front shield
¨
Approx. 40 mm (1,6 in) below drill a 10
mm (0,4 in) dia. hole for the ON/OFF
switch (1).
Fig. 7