Door Position Setup and DAU Instructions
GT-01 Touch Screen
2. A “Please Wait” logo message will flash for a few seconds and then a selection
screen will show.
1. Plug the eight prong Phoenix Connector into GT-01. For operator series before
ʻ
G,
ʼ
use the black cable, plug the opposite ROUND end into the PLC unit on the
operator. For
ʻ
G
ʼ
series and above, use the gray cable and plug the opposite
ROUND end into the receptacle on the end cover of the operator (right side).
3. For GT-01 software prior to Ver. 3, the screen in Fig. 3 will display. Choose either
ʻ
Standard
ʼ
or
ʻ
Main/Sub
ʼ
operator. For Ver. 3 of the GT-01 software, the screen in
Fig. 4 will display. For Main/Sub, select
ʻ
Lead Door
ʻ
or
ʻ
Follow Door
ʼ
on the next screen (Fig. 5), then skip to step 5.
Fig. 2
Fig. 3
Fig. 4
Fig. 5
4. Selecting Standard will give you the screen shown in Fig. 6. Choose the appropriate
serial number series of the operator, to get to the first preset screen (Fig. 7)
Fig. 6
Fig. 7