MACHINE INSTALLATION
Volt
400 V
Hertz
50 Hz
Ampere
6 A
Pole
3P + N + E
Take necessary precautions while the machine is being taken off the vehicle. Prevent the slippage of the
machine. While picking the machine, lifting procedure must be carried out without damaging its body. The
machine legs that are taken off before transportation must be mounted again.
Expert M.S.K. personnel will carry out all procedures related to loading and unloading, and conduct assembly,
mounting and commissioning procedures as well as performance tests, if necessary. These procedures are
evaluated on machine basis and carried out for products deemed necessary. Procedures such as adjustment
of the parts and equipment, which should be prepared before commissioning the machine, must be carried
out. Necessary operations are as follows.
6.4 Placement of Machine
Predefined hanger lifting points are used while positioning the machine at the site described in the plant
placement of machine. Previously exemplified transport methods can be applied. Use forklift while lowering
down the machine and carrying it to the installation site. Methods other than this may damage your machine.
6.5 Fixing on Ground
Before installing the machine, check the level of ground using a water balance. The machine must be placed
considering the maintenance and operating spaces. Rear and side spaces as well as spaces recommended for
maintenance procedures etc. are provided. To fix the machine on the ground properly, make sure that the
vibration-blocker stands which are provided with the machine are mounted.
6.6 Preparation for Commissioning
Remove the packaging of the machine units. Movable parts on machine were fixed with tools such as clamps
etc. in order to avoid any damage during transportation. Remove the fixing tools on the machine. Movable
parts of the machine are generally cleaned by using an anti-rust oil. Electrical and pneumatic connections with
power supply are made for the machine to function properly.
WARNING: Electrical connection of the machine must be conducted by a personnel specialized in
electricity.
6.7 Electrical Connections
Summary of Contents for OMRM 125 PRO
Page 1: ...OMRM 125 PRO AUTOMATIC SINGLE HEAD ALUMINIUM PROFILE CUTTING MACHINE OPERATING MANUAL ...
Page 10: ...9 4 4 1 General Structure 10 4 2 Machine Placement 12 MACHINE STRUCTURE AND PLACEMENT ...
Page 43: ...42 OMRM 125 PRO 9 PROBLEMS AND SOLUTIONS ...
Page 45: ...44 OMRM 125 PRO 10 WARRANTY DISCLAIMER ...
Page 49: ...48 OMRM 125 PRO 1 ELECTRICAL CIRCUIT DIAGRAM ...
Page 50: ...49 ...
Page 51: ...50 OMRM 125 PRO ...
Page 52: ...51 ...
Page 53: ...52 OMRM 125 PRO ...
Page 54: ...53 ...
Page 55: ...54 OMRM 125 PRO ...
Page 56: ...55 ...
Page 57: ...56 OMRM 125 PRO ...
Page 58: ...57 ...
Page 59: ...58 OMRM 125 PRO 2 PNEUMATIC CIRCUIT DIAGRAM ...
Page 62: ...61 1 No Name Quan ty 1 Ø40 x 60 mm Double Acting Pneumatic Cylinder 2 Upper Body ...
Page 65: ...64 OMRM 125 PRO Right Conveyor 1 No Name Quan ty 1 Profile Sliding Roller 8 ...
Page 66: ...65 Left Conveyor 1 No Name Quan ty 1 Profile Sliding Roller 8 ...