40
OMRM
125
PRO
8
MAINTENANCE
1–) The nut of the belt stretching bolt seen in the figure above is loosened and tightened with 13-wrench to
bring the belt to an appropriate tension adjustment.
2–) Apart from the tension adjustment, it must be checked whether there is any deformation in the belt. If
the belt is defective, it must be replaced with a new one.
3–) Then the bolts of the motor mounting bracket are mounted again and fixed, and the belt housing is
replaced.
Belt Stretching Bolt
Motor Moun�ng Bracket
13 Wrench
Summary of Contents for OMRM 125 PRO
Page 1: ...OMRM 125 PRO AUTOMATIC SINGLE HEAD ALUMINIUM PROFILE CUTTING MACHINE OPERATING MANUAL ...
Page 10: ...9 4 4 1 General Structure 10 4 2 Machine Placement 12 MACHINE STRUCTURE AND PLACEMENT ...
Page 43: ...42 OMRM 125 PRO 9 PROBLEMS AND SOLUTIONS ...
Page 45: ...44 OMRM 125 PRO 10 WARRANTY DISCLAIMER ...
Page 49: ...48 OMRM 125 PRO 1 ELECTRICAL CIRCUIT DIAGRAM ...
Page 50: ...49 ...
Page 51: ...50 OMRM 125 PRO ...
Page 52: ...51 ...
Page 53: ...52 OMRM 125 PRO ...
Page 54: ...53 ...
Page 55: ...54 OMRM 125 PRO ...
Page 56: ...55 ...
Page 57: ...56 OMRM 125 PRO ...
Page 58: ...57 ...
Page 59: ...58 OMRM 125 PRO 2 PNEUMATIC CIRCUIT DIAGRAM ...
Page 62: ...61 1 No Name Quan ty 1 Ø40 x 60 mm Double Acting Pneumatic Cylinder 2 Upper Body ...
Page 65: ...64 OMRM 125 PRO Right Conveyor 1 No Name Quan ty 1 Profile Sliding Roller 8 ...
Page 66: ...65 Left Conveyor 1 No Name Quan ty 1 Profile Sliding Roller 8 ...