General Assembly Procedures
Assemble and mount chassis.
1.
Stick the identity label (ENG-LBL-0001) to the inside of the metal chassis.
2.
Install the supplied nylon stand-offs into each chassis by inserting them from the rear.
NOTE:
This step MUST be performed before the chassis is mounted to the wall. Once
the chassis has been mounted, it is not possible to insert the stand-offs.
a)
There are five stand-offs for each board, but there are more holes than that in the
chassis.
b)
Determine which holes you will use based on the size of the boards you are installing.
3. Mount the chassis.
a)
Use four bolts to mount each chassis securely in place.
b)
Make sure the chassis door can swing open freely to allow for access after the
installation is complete.
4.
Remove any knock-outs that may be required to accommodate conduit or wiring.
WARNING: Knockouts
DO NOT ATTEMPT TO REMOVE THE KNOCKOUTS WITH A HAMMER.
Banging on
the knockouts may result in shock to the circuit boards, which could cause
permanent damage. Pry them out using a screwdriver.
5.
Assemble the chassis.
a)
Install the power supply board in each chassis first. If you install the MAIN BOARD or
a Door or INPUT OUTPUT BOARD first, you may find it difficult to position your
screwdriver in a way that will allow you to install the power supply board later.
b)
Install the MAIN BOARD in the control chassis.
•
Install each board by aligning it with the previously installed stand-offs and
then gently pressing it into place. You will hear a slight click as the board
settles into the locked position on the standoffs
c)
If there is a DOOR BOARD or an INPUT OUTPUT BOARD for the control chassis, install
that now, using the procedures described for the MAIN BOARD.
d)
If there are expansion chassis, install the appropriate DOOR BOARDs and/or INPUT
OUTPUT BOARDs in each chassis at this time, using the procedures described for the
MAIN BOARD.
e)
You will note that the control panel kit contained an adhesive Identity Label. This
label should be affixed to the inside of the front door of the control chassis, beneath
the large wiring guide.
6.
Install the tamper switch in each chassis.
a)
Install the tamper switch in each chassis by removing the hex collar, seating the
switch inside the provided mounting bracket, and reattaching and tightening the hex
collar.