4-4
TARP INSTALLATION
250933
Fig. 2
1.
Install side board extensions to box.
See page 1-6.
2.
Assemble end caps (38) to front and
rear side boards. See Fig. 2.
Fig. 1
NOTE: Use a center punch to remove knock-
outs from side boards. Punch out a set of
knockouts for each bow.
3.
Assemble bow brackets (25) to left
side board. See Fig. 3.
4.
Assemble latch plate (32) and bow
brackets (25) to right side boards.
See Fig. 3.
5.
Install bows (24) in brackets (25). See
Fig. 3.
6.
Weld two halves of ridge pole (36) (see
Table 1, Step 9, for length). Install
brackets (35) and ridge pole (36) to
front and rear boards. See Fig. 3.
270917-2
Fig. 3
270917-3
Summary of Contents for Corner Auger
Page 30: ...2 6 250937 06 30 00 ...
Page 44: ...2 20 233214D 07 14 98 ...
Page 50: ...3 2 SCALE KIT LAYOUT 250917 04 16 01 ...
Page 62: ...3 14 NOTES ...
Page 64: ...4 2 250932 11 13 97 ...
Page 70: ...4 8 234913 MODELS 672 674 TARP 04 01 02 ...
Page 79: ...4 17 NOTES ...