05
-
2015 Rev.1
9.
64
Parte 9 Manutenzione Ordinaria
9.8 NUTS, BOLTS AND PINS TIGHTENING
PROCEDURE
9.8.a
Bring the Platform to the
Zero Power Condition
(Part 2
page 2.16).
9.8.b
The operator must check once a month nuts and bolts and
pins and, if it necessary, must call for the technical assis-
tance which will carry out the necessary maintenance.
In any case, once a year he must call for the technical as-
sistance which will check and carry out the maintenance of
the nuts and bolts and pins of all the Platform.
Do not forget that all the operations must be carried out
only and strictly by maintenance technicians authorized by
Braviisol Divisione Meccanica srl and who have followed a
training course in the authorized assistance centers.
9.9 WIRING CHECK
9.9.a
These operations must be carried out every two months.
To carry out the visual check of the cables do as follows.
9.9.b
:The operator must:
-
wear work clothes, in particular gloves,
-
have read and well understood the safety prescriptions
shown in the Part 2 of this manual,
-
bring the Platform to the
Zero Power Condition
(Part 2
page 2.16).
9.9.c
Remove all the covers.
9.9.d
Check the wear and tear state of the cables.
9.9.e
If it is necessary to replace them, please call for the tech-
nical service which will provide with the replacement.
9.9.f
The wiring check procedure is finished.
04
-
2020 Rev.01
P
ART 9 ORDINARY MAINTENANCE