6.
45
Parte 6 Utilizzo
05
-
2015 Rev.1
6.3 FUNCTION TEST
Do not forget that, before carrying out the Function Test, the operator must have carried
out the pre
-
starting inspection procedure.
6.3.a
Danger –
Risk of electrocution
The machine is
NOT
insulated.
6.3.b
Maintain safe clearances from electrically charged conductors (power lines) and appa-
ratus. You must allow for machine sway (side to side movement) when elevated and
electrical line movement. This machine does not provide protection from contact with, or
proximity to, an electrically charged conductor.
6.3.c
Warning: electrocution hazard
Before operating the Platform make sure that the area above it is free from obstacles in
order to allow the full elevation of the Platform itself.
6.3.d
Do not operate the Platform if the following controls show a defect.
6.3.e Function Test
-
A) Ground Control Operation and check
6.3.e1
Turn the key switch
Q2
to the right (chassis control).
6.3.e2
Press and keep pressed the lifting button
Q5
to allow the raising of the basket. If you
want to stop the platform elevation release the button.
6.3.e3
Press and keep pressed the lowering button
Q6
to allow the lowering of the basket. If
you want to stop the platform descend release the button.
6.3.e4
Q3
Stop/Emergency working test.
With the Platform in motion, press the
Q3
Stop/Emergency button.
The Platform must immediately stop.
6.3.e5
Emergency mechanical lowering lever test.
With the Platform with the basket lifted, pull the emergency lever to mechanically lower
the basket of the Platform.
The release of the lever must stop the lowering.
6.3.e6
The
“
Working Test procedure –
A) Ground Control Operation and Check
”
is finished.
Proceed with the
“
Function test procedure –
B) Check and working of the basket control
”
.
04
-
2020 Rev.01
P
ART 6 OPERATIONS