Page 22
Perform all procedures listed in previous section also
1 Year
or
1250
Cycles
continued
8 Weeks
or 200
Cycles
MAINTENANCE and LUBRICATION
Clean and lubricate. Apply Light Oil - See
Lubrication Diagram
Apply Door-Ease. See Lubrication Diagram
Tighten, replace or correct as needed.
Correct as needed
Clean and remove debris or obstructions
If drifts too fast, adjust applicable Drift Micro-
switch Cam so drift begins at reduced height.
Correct as needed
Blow out with air compressor
Clean and lubricate. Apply Door-Ease
Resecure, adjust microswitches, replace dam-
aged parts or otherwise correct as needed.
Cable at pulley and hinge areas
Drive arm slot
Inspect drive arm pivot points (mounting
screws, nuts and bearings) for positive secure-
ment, wear or damage
Inspect drive arm slots for excessive wear or
damage
Clean ramp and ramp mounting area (ensure
no debris in area to obstruct stowing/stacking)
Cycle ramp and observe drift speed during
deploy and stow functions
Inspect ramp for wear, damage or any abnor-
mal condition.
Remove sub
Á
oor (pan cover) and clean dirt
and other foreign debris
Remove sub
Á
oor (pan cover) and lubricate
drive arm gear and cylinder gear rack
Remove sub
Á
oor (pan cover) and inspect:
• Pump mounting bolts for securement (loose
or missing)
• Drive arm and gear rack weldment teeth
for foreign objects, wear or damage (bent,
deformed, misaligned), positive securement
and proper operation
• Gear rack weldment pin securement E-clip
(loose or missing)
• Hydraulic cylinder, hoses,
À
ttings and con-
nections for wear, damage or leaks
• Harness cables, wires, terminals and con-
nections for securement or damage
• Relays for securement or damage
• Microswitches and cams for securement and
adjustment
• Microswitch wires and terminals for secure-
ment or damage
Summary of Contents for BF3255Y-12V
Page 33: ...Page 31 BLANK for LAYOUT...