Page 17
RAMP INSTALLATION
Installed Ramp - Stowed
Chassis
Chassis
Figure G
Installed Ramp - Deployed
There
must
be a minimum 1/8” clearance
between the deployed ramp assembly and
the vehicle
Á
oor or any obstruction
on the
Á
oor (such as a rubber sill or threshold).
Chassis
Chassis
Figure H
As viewed from outside the vehicle
Left
Right
Out
In
Stowed RA300
Ramp positioned in
the “
Á
oor pocket.”
st be a minimum 1/8” clearance
he deployed ramp assembly and
e
Á
oor or any obstruction
on the
as a rubber sill or threshold).
Summary of Contents for BF3255Y-12V
Page 33: ...Page 31 BLANK for LAYOUT...