Ozone Swim 1000, 2000 and 3000 series User Manual
–
JULY 2017 ENG rev 2.0
P a g e
6 | 15
Step 8:
Set timer on Ozone Swim system to recommended run time for pool size and environment
(refer to page 12)
Step 9:
Plug pump power cable into Ozone Swim unit below timer. Turn unit ON to manual. Ozone
light should be on. Check all plumbing for visible leaks.
Step 10:
Adjust the Chlorine cell output to recommended output.
NOTE:
We recommend running your system at maximum output for the first week of
operation.
Step 11:
Set the master switch to the Auto position,
Important notes
Chlorinator Cell Housing Installation:
The Ozone Swim cell housing must be plumbed into the return line of the pool filter system
after the filter and any diversion values.
In situations where a heater is incorporated, the Ozone Swim cell housing must be installed
after the heater. Should a solar heating system be installed, the housing must be plumbed
after the solar diverters and after the water exits the solar system and re-joins the main
stream pool return line. Ensure there is a gas trap (see below)
Pump Outlet Socket:
A 240volt pump output power socket is supplied and located on the left-hand underside of
the power supply. Your pool pump power supply lead should be plugged in to the socket so
that when the time clock switches at the designated times both the Ozone Swim and the
and pump will activate in unison.
The pump socket is designed to operate a single pool pump of maximum 1.5 hp (horse
power) only. Do not attempt to operate any equipment other than your pool pump from
this socket as damage might occur to the power supply unit that is not covered under
warranty.