Section 9 – NAVIGATING THE TOUCH SCREEN
9.1 The
Touch
Screen
.......................................... 56
9.2
Using the Touch Screen .................................. 56
9HUL¿FDWLRQ3URFHVVIRU6DIHW\5HODWHG
Parameters ...................................................... 58
9.4
While Operating - Checking Individual
Parameters ...................................................... 59
&RQ¿JXULQJ3DUDPHWHUVRQ,QGLYLGXDO
Controllers ...................................................... 60
9.6
Setting the Date and Time on the
System Display......................61
&RQ¿JXUDWLRQ0HQXV$//
.......................... 62
6\VWHP,GHQWL¿FDWLRQ $FFHVV
...................... 62
&+&HDW&RQ¿JXUDWLRQ
.................... 62
2XWGRRU5HVHW&RQ¿JXUDWLRQ
......................... 62
'+:'RW:DWHU&RQ¿JXUDWLRQ
... 63
:DUP:HDWKHU6KXWGRZQ&RQ¿JXUDWLRQ
........ 63
'HPDQG3ULRULW\&RQ¿JXUDWLRQ
...................... 63
0RGXODWLRQ&RQ¿JXUDWLRQ
.............................. 63
3XPS&RQ¿JXUDWLRQ
....................................... 63
6WDWLVWLFV&RQ¿JXUDWLRQ
.................................. 64
9.7.10 High Limits .................................................... 64
9.7.11 Stack Limits .................................................... 64
9.7.12 Delta T Limits................................................. 64
)URVW3URWHFWLRQ&RQ¿JXUDWLRQ
....................... 64
9.7.14 Burner Control Ignition .................................. 65
6\VWHP&RQ¿JXUDWLRQ
..................................... 65
6HQVRU&RQ¿JXUDWLRQ
...................................... 65
/DJ6ODYH&RQ¿JXUDWLRQ
.............................. 66
/HDG0DVWHU&RQ¿JXUDWLRQ
.......................... 69
9.8
Parameter Defaults and Ranges .................69-72
&RQ¿JXULQJD*DWHZD\&RQWURO
.................... 73
9.10
Variable Speed Flow Control (V.S.P.C.) System . 74
9.11
Combustion Setup Procedure ......................... 75
Section 10 - INITIAL STARTUP INSTRUCTIONS
10.1
Filling the Boiler System ................................ 78
10.2 Initial
Operation
............................................. 79
10.2.1 Initial Burner Operation ................................. 79
10.2.2 Combustion Setup Procedure ......................... 79
10.3
Shutting Down the Unit .................................. 79
10.4
Restarting the Unit.......................................... 79
Section 11 – MAINTENANCE
11.1 System
Maintenance....................................... 80
11.2 Maintenance
Notes
......................................... 80
11.2.1 Burner
............................................................. 80
11.2.2 Modulating
Gas
Valve/
Venturi
...................... 80
11.2.3 Controller
....................................................... 81
11.2.4 Spark Ignition Electrodes ............................... 81
11.2.5 Flame
Sensor
.................................................. 81
11.2.6A Blower Model 1600 ...................................... 81
11.2.6B Blower Model 4000 ...................................... 81
11.2.7 Heat
Exchanger
Tubes
.................................... 82
11.2.8 Gas Pressure Switches .................................... 82
11.2.9 Battery Back Up for Date and Time ............... 83
Section 12 – TROUBLESHOOTING
12.1
About Lockouts, Holds, and Alerts ................ 84
12.1.1 Responding to a Lockout, Hold,
or Alert ............................................................ 84
12.1.2 Viewing the Lockout and Alert
Histories ......................................................... 84
12.2 Troubleshooting
Table
...............................86-94
12.3
Diagnostic Tests and Input/Output
Indicators ........................................................ 95
12.4 Lead/Lag
Diagnostics
..................................... 96
12.5 Statistics
......................................................... 96
12.6 Analysis
.......................................................... 96
12.7 Control
Snapshot
............................................ 97
12.8 Operating
Sequence
........................................ 97
Section 13 – REPLACEMENT PARTS
13.1 General
Information
....................................... 98
13.2
Component Illustrations, Parts Lists,
and Part Numbers ....................................98-113
13.2.1 Frame and Jacket Assembly ........................... 99
13.2.2 Final Assembly ............................................. 101
13.2.3 Waterway Outlet Assembly .......................... 102
13.2.4 Blower Assy, Model 1600 ............................ 103
13.2.5 Blower Assy, Model 2000 ............................ 104
%ORZHU$VV\0RGHOV
.............. 105
%ORZHU$VV\0RGHOV
.............. 107
13.2.8 Gas Train Assembly, Models 1600 thru 3000 ...109
*DV7UDLQ$VVHPEO\0RGHOV
.. 111
13.2.10 Control Panel Assembly .............................. 113
13.2.11 Distribution Box Assemblies ................ 114-117
ii
Summary of Contents for Brute MagnaTech BMGH1600
Page 4: ......
Page 47: ...Page 43 Figure 24 High voltage wiring diagram Model 1600 208V Single Phase ...
Page 54: ...Page 50 8 12 Ladder Diagrams continued Figure 31 Model 1600 208V 1 Phase ladder diagram ...
Page 56: ...Page 52 8 12 Ladder Diagrams continued Figure 33 Model 2000 208V 1 Phase ladder diagram ...
Page 104: ...Page 100 1 13 12 4 3 5 13 2 15 DETAIL A 9 10 8 DETAIL Final Assembly ...