![background image](http://html.mh-extra.com/html/bosch/vle-21-series/vle-21-series_repair-instructions_46188046.webp)
1 689 975 224
2013-11-06
|
Robert Bosch GmbH
46 | VLE 21xx | Maintenance and upkeep
en
10. Maintenance and upkeep
Regular upkeep of the lifting platform is essential to
ensure a long service life and permanent readiness for
use.
10.1 Maintenance schedule
No.
Component
Action
Interval
Agent
2130
2130F
2130E
2130EL
2140EL
1
Lifting spindle
nut system
Check lubricating film (oil)
Check once monthly
Lubricate as required
Spindle oil
1 692 871 003
x x
x x
Check lubricating film (grease)
Check once monthly
Lubricate as required
Multi-purpose grease
x
4
Swivel arm
mounts
Lubricate
At least every three months
Multi-purpose grease
x x x x x
5
Belt
Check belt tension
Every three months
x x x x x
7
Foot bearing
Lubricate
Every three months
Multi-purpose grease
x x x x x
8
Spindle oiler
Check level
Every six months
Spindle oil
1 692 871 003
x x
x x
9
Chain
Lubricate
Check chain tension
Lubricate every three months
Multi-purpose grease
x x
Tab. 8:
Maintenance schedule
Fig. 24: VLE 2130
!
The lifting platform must always be de-energised
when performing any work. The platform must also
be safeguarded against unauthorised switch-on.
Fig. 25: V-belt pulley
Fig. 26: Lifting carriage
Fig. 27: Base
Summary of Contents for VLE 21 Series
Page 1: ...VLE 21xx de Instandsetzungsanleitung 2 Säulen Hebebühne en Repair instructions 2 post lift ...
Page 2: ...1 689 975 224 2013 11 06 Robert Bosch GmbH 2 VLE 21xx 2VLE 21xx de ...
Page 27: ...1 689 975 224 2013 11 06 Robert Bosch GmbH Stromlaufplan VLE 21xx 27 de 12 4 3 VLE 2130 E ...
Page 51: ...1 689 975 224 2013 11 06 Robert Bosch GmbH Circuit diagram VLE 21xx 51 en 12 4 3 VLE 2130 E ...