![background image](http://html.mh-extra.com/html/bosch/vle-21-series/vle-21-series_repair-instructions_46188028.webp)
1 689 975 224
2013-11-06
|
Robert Bosch GmbH
28 | VLE 21xx |
en
Contents English
1.1.2 Symbols in this documentation
3.2.2 Nut replacement (VLE 2130 E)
3.2.3 Nut replacement (other types)
5.2.3 Diagnosis function / activation
5.3.1 Wiring of potentiometers
5.4.1 Position "0": Operation basic setting 33
Storage of lower cut-out points
5.5.2 Position "2": Equalisation of support
Storage of upper cut-out points
Main column support arm single
traverse 34
Secondary column support arm
single traverse
5.5.6 Position "6": Storage of safety
stop position and additional acoustic
signal on further lowering of support
arms 34
5.5.7 Position "7": Potentiometer test
5.5.8 Position "8": Activation / diagnosis
Fitting manual release mechanism
9.1.2 VLE 2130 EL and VLE 2140 EL
Emergency lowering with motor operation
9.2.3 VLE 2130 EL and VLE 2140 EL
10.2 Lubricating lifting spindles
10.2.1 Models with spindle oiler
10.2.2 Models with grease lubrication
10.3 Power transmission elements
10.3.1 Elongation of power transmission
10.3.2 Adjusting chain tension
10.4.1 Lubricating swivel arm joints
12.4.1 VLE 2130 and VLE 2130 F
Summary of Contents for VLE 21 Series
Page 1: ...VLE 21xx de Instandsetzungsanleitung 2 Säulen Hebebühne en Repair instructions 2 post lift ...
Page 2: ...1 689 975 224 2013 11 06 Robert Bosch GmbH 2 VLE 21xx 2VLE 21xx de ...
Page 27: ...1 689 975 224 2013 11 06 Robert Bosch GmbH Stromlaufplan VLE 21xx 27 de 12 4 3 VLE 2130 E ...
Page 51: ...1 689 975 224 2013 11 06 Robert Bosch GmbH Circuit diagram VLE 21xx 51 en 12 4 3 VLE 2130 E ...