1 689 975 224
2013-11-06
|
Robert Bosch GmbH
42 | VLE 21xx | Settings
en
7.2.2
Adjusting spindle guide
Contents
Adjusting spindle guide
Applicability
VLE 2130 EL, VLE 2140 EL
The spindle guide must be adjusted after setting the
overtravel.
1.
Tighten the hose clamp (Fig. 15, Pos. 1) at the
spindle guide (Fig. 15, Pos. 2).
Fig. 15: Adjusting spindle guide
1 Hose clamp
2 Spindle guide
i
Continue tightening the hose clamp until the spindle
attains a moment of resistance of
22 Nm
. Check this
with a torque wrench at the end of the spindle.
2.
Perform one lifting operation.
3.
Check and if necessary correct the setting.
7.2.3
Adjusting belt tension
Contents
Adjusting tension of ribbed belt
Applicability
VLE 2130 EL, VLE 2140 EL
Special tools and
other items
Vibration meter
The ribbed belt should be checked every six months
and if necessary adjusted as follows:
1.
Detach the cover.
2.
Cause the ribbed belt to oscillate by tapping or
plucking.
Fig. 16: Plucking ribbed belt
3.
Use a vibration meter to measure the frequency of
the oscillations (in hertz).
Fig. 17: Measuring frequency
i
If the ribbed belt tension is correct the frequency
will be
220–240 Hz
.
4.
Re-tension if necessary with the tensioning bolt
(between the motor and column).
Fig. 18: Re-tensioning with bolt
5.
Check the tension again after several lifting and
lowering operations.
Summary of Contents for VLE 21 Series
Page 1: ...VLE 21xx de Instandsetzungsanleitung 2 Säulen Hebebühne en Repair instructions 2 post lift ...
Page 2: ...1 689 975 224 2013 11 06 Robert Bosch GmbH 2 VLE 21xx 2VLE 21xx de ...
Page 27: ...1 689 975 224 2013 11 06 Robert Bosch GmbH Stromlaufplan VLE 21xx 27 de 12 4 3 VLE 2130 E ...
Page 51: ...1 689 975 224 2013 11 06 Robert Bosch GmbH Circuit diagram VLE 21xx 51 en 12 4 3 VLE 2130 E ...