
6720892984 (2019/02) US
SSB
42 | Boiler cascade
6 .2
Compensation for secondary manifold temperature
on single boiler
To compensate the temperature after the manifold an additional system
sensor and the boiler cascade controller must be activated.
•
The boiler cascade controller on the first burner must be activated by
setting parameter 73 to managing boiler.
• The system sensor after the manifold must be connected to the
second burner.
6 .3
Set Switches for all cascade boards
6 .3 .1
Power off all the boards
Power off all the boards and set all the switch (S1 and dip switches).
6 .3 .2
Set AL Power switch S1 and Dip switch for 905MN Managing
of Boiler X
Set AL Power Switch S1 in ON position
Set Dip Switch with value 1
ON
OFF
J8
J11
J8
J11
905MN
S1
Dip Switch
1
2
3
4
5
6
7
8
6 .3 .3
Set AL Power switch S1 and Dip switch for 905MN Dependent
boards
Set AL Power Switch S1 in OFF position
Set Dip Switch with value 2 or bigger
Dip-switch setting
Burner Operation
LabVision
Device
Address
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
Stand alone burner
100
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1st burner (managing)
100
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
1
ON
DIP
2 3 4 5 6 7 8
2nd burner (depending)
101
6 .4
Set the Modules and Boiler Cascade Settings
6 .4 .1
Cascade of Modules: Set the address for all the modules
Boards
Set the dipswitch (as explained in paragraph “6.3.3 Set AL Power switch
S1 and Dip switch for 905MN Dependent boards” pag. 42)
6 .4 .2
Cascade of Modules: Set Number of expected Modules (to do
only in the managing of Modules)
By default the number of expected Modules are 8. If less number of
Modules are expected set the parameter (*) Number of Units. (e.g. Set 5
if the number of Modules are in total 4, including the managing board)
Menu
¨
Settings
¨
Boiler Settings (password 1200)
¨
Module
Cascade Settings
¨
(*) Number of Units
6 .4 .3
Cascade of Boilers: Set Boiler Address for all the Managing
boards
Assign the Boiler Address in the managing boards (that has the dipswitch
set to 1).
Menu
¨
Settings
¨
Boiler Settings (password 1200)
¨
Boiler Cascade
Settings
¨
(73) Boiler Address
Boiler x
(73) Boiler Address
Boiler Managing
Managing
Boiler Dep 1
Dep. 1
Boiler Dep 2
Dep. 2
6 .4 .4
Cascade of Boilers: Set Number of expected Boiler (to do
only in the managing of Boiler)
By default the number of expected Boiler are 8. If less number of Boilers
are expected set the parameter (*) Number of Boilers. (e.g. Set 3 if the
boilers in the cascade are 3, including the Managing boiler).
Menu
¨
Settings
¨
Boiler Settings (password 1200)
¨
Boiler Cascade
Settings
¨
(*) Number of Boilers
Summary of Contents for SSB1000 SA
Page 82: ...6720892984 2019 02 US SSB ...
Page 83: ...SSB 6720892984 2019 02 US ...