36/
56
Bosch Rexroth AG
Drive modules | RE 51150-B/07.11
Commissioning
Re-commissioning after extended standstill
8.2
When re-commissioning the system after an extended standstill period, you
should proceed as follows:
Check:
f
The oil level
–
The accumulator pressure on the gas side
–
The tightness of the hydraulic components and the line system
–
Perform switch-on procedures with increased caution.
f
Bleed the hydraulic system.
f
Observe the information in the operating instructions of the machine manufacturer.
f
f
Contact Bosch Rexroth for the re-commissioning after a standstill of more than
3 months.
f
In order to re-commission the drive module, proceed as described in chapter
8.1 "First commissioning".
Standstill 3 months
Re-commissioning