62/68
Bosch Rexroth AG
Training system mMS 4.0 | R901429162/04.16
Maintenance and inspection
12.2
Maintenance and inspection schedule
In the following table, the work is organized by maintenance interval and then by
assembly / part. The intervals are must be kept to.
Table 11:
Maintenance and inspection work on the training system
When?
What?
Where?
Comments
daily/
prior to
each use
Overall training system
Clean environment
of the training
system
Clean and keep
the working
surfaces free.
Remove parts lying
around
When?
What?
Where?
Comments
Weekly
Overall training system
Inspect electrical
connection cables
and lines for visible
damage (friction
marks, cracks, cuts).
Have damage
rectified by the
responsible
qualified electrician
right away
Connection elements
Inspect electrical
devices, control
boxes and switches /
buttons for visible
damage (cracks)
Have damage
rectified by the
responsible
qualified electrician
right away
Inspect the visual
inspection for
damage and
firm fitting
Secure loose
screws etc again.
Have damage
rectified right away.
Notify Bosch
Rexroth After-sales
service.