Training system mMS 4.0 | R901429162/04.16
Bosch Rexroth AG
45/68
Set-up, installation and commissioning
9
Set-up, installation and commissioning
9.1
Setting up the mMS 4.0 training system
Perfect execution of the set-up requires that:
delivery, transport or unpacking has been carried out properly as per chapter 7.2.2,
all of the required parts are in range and in a functional condition,
required auxiliary equipment, such as lifting tools, tables, are present.
Before the final set-up, please note the following points:
Make sure the required clearance for the mMS 4.0 training system and
the safety clearances to other fixed installations is present (for specifications,
see Fig. 1: Space requirement (in cm), ). Any possible attachment parts
should be taken into account.
Check the levelness of the installation surface.
Make sure that an electrical connection is present.
Make sure there is sufficient lighting at the place of installation.
The following must be taken into account during installation:
Check alignment of the mMS 4.0 training system at the place of installation.
Lock the castors of the stations.
Connect each station with each other mechanically.
Also connect the electrical and pneumatic connections.
NOTE
Risk of anomalies, deviations, faults, defects during set-up or inspection
Risk of damage!
Do not put the mMS 4.0 training system in operation or place it immediately
out of service.
Find the causes of the fault and fix the defect.
Replace the damaged part.
Preparations for the set-up
Installation