Bosch Power Tec GmbH
Storage system |
User manual
En
g
lis
h
DO_BA_2013_H
Y
B
_A_3ENG_BBo
17.01
.2014
English
Operation | 37
4
Operation
4.1
Switching on the storage system
Prerequisites
Measurements are carried out according to the
standard DIN EN 62446.
▶
Procedure
1. Open the housing door
2. Turn the On/Off switch to
On
4.1: On/Off
switch
(1)
3. Close the housing door on the storage system
The storage system program starts up
automatically. This may take some time: A rotating
hourglass is displayed.
You will hear several clicking sounds.
Only during the initial commissioning of the
storage system: The commissioning wizard
launches.
4. Follow the on-screen instructions of the
commissioning wizard
Info
Once you have completed the instructions in the
commissioning wizard, this is not repeated when the
system is restarted.
■
The storage system has been switched on.
(1)