Casting with the BD CMT
BD CMT
-16-
7.2 Heat BD insoles
1)
Ask your customer to remove their feet. Use Si-
licone spray on the molding pillows to ensure
easy removal of the shaped insoles. Lay the in-
sole into the molding pillow where the custo-
mer´s foot was.
Pay attention to proper position!
2)
Carefully place your customer´s foot onto the in-
soles. Start with the heel and align the forefoot
so that it is centered on the insole.
During the whole process the customer
is to remain seated.
3)
Double check that the foot, ankle and knee re-
mains in an aligned and neutral position.
4)
Wait for 3 to 5 minutes and check if the insoles
are cooled sufficiently so they can be removed
from the molding pillows.
BD 3D insoles may require longer coo-
ling times than BD Step In insoles.
Total cooling time can be reduced by
using a Cool Spray or Cool packs.
5)
Check the blank for rigidity by gently pulling up.
Once the insoles are stiff enough, remove them
carefully out of the molding pillow and finish
them by trimming or adding posting or refost-
abs.
Summary of Contents for BD CMT
Page 2: ...78 650 003 07 12 2016 ...
Page 31: ......