Attach Spindle Top (Z7) to the Z Frame Assembly with two
M4 x 16 Machine Screws and Nuts as shown. Do not tighten the
Machine Screws and Nuts at this stage. They will be tightened
in a later step after the Router has been mounted. The Interlock
Bottom and Top must be able to move slightly from front to
back, this allowance will make installing the Router easier. You
only need to make sure that the machine Screws and Nuts are
engaged to keep the Screws from falling out.
Step 5
Loosely secure the Spindle Bottom Supports together with two
M4 x 30 Machine Screws and Locknuts as shown. Do not fully
tighten the nuts.
Summary of Contents for REVOLUTION
Page 1: ...Assembly Manual Rev 2 5 Rotating Axis CNC Router REVOLUTION ...
Page 21: ...20 1 2 3 4 ...
Page 23: ...22 The finished Z Assembly should look like this ...
Page 82: ...81 GR18 Right Gantry Side 1 GR20L GR20R Gantry Mid Vertical Support 2 ...
Page 85: ...84 M18 M6 Lock Nut 5 H9 20 X 2 Screw 1 H45 20 Wing Nut 1 H10 20 Nut 1 H75 Spacer 1 ...
Page 96: ...95 Completed Left Side ...
Page 100: ...99 Completed Right Side ...
Page 143: ...142 Completed Views Front View Back View ...
Page 144: ...143 Left Side Right Side ...
Page 145: ...144 Properly Wired Controller ...