102
Step 8
Assemble the A-Axis Stepper Motor Mount
8a
Using the remaining previously built Idler Bearing
Assembly (see pages 76-77)
insert the Idler Bearing Assembly, with an Idler Fender
Washer, into the A-Axis Stepper Motor Mount (GR2),
install a Idler Fender Washer and secure with a M5 Lock
Nut.
Washers on both
sides of Motor Mount
Summary of Contents for REVOLUTION
Page 1: ...Assembly Manual Rev 2 5 Rotating Axis CNC Router REVOLUTION ...
Page 21: ...20 1 2 3 4 ...
Page 23: ...22 The finished Z Assembly should look like this ...
Page 82: ...81 GR18 Right Gantry Side 1 GR20L GR20R Gantry Mid Vertical Support 2 ...
Page 85: ...84 M18 M6 Lock Nut 5 H9 20 X 2 Screw 1 H45 20 Wing Nut 1 H10 20 Nut 1 H75 Spacer 1 ...
Page 96: ...95 Completed Left Side ...
Page 100: ...99 Completed Right Side ...
Page 143: ...142 Completed Views Front View Back View ...
Page 144: ...143 Left Side Right Side ...
Page 145: ...144 Properly Wired Controller ...