29
2b
Attach the two lower SG20U Bearing Assemblies to
the X Carriage Assembly as shown. These will be
tightened in a later step.
NOTE: The assembly order for
the Lower Bearing: Machine
Screw, SG20U Bearing (hub
facing toward the Bearing
Washer), Bearing Washer,
Plywood, Eccentric Washer,
Eccentric Spacer, secured with
a Lock Nut.
.
Lower Bearing Assembly with Eccentric
Spacer
Upper
Bearing
Lower
Bearing
Summary of Contents for REVOLUTION
Page 1: ...Assembly Manual Rev 2 5 Rotating Axis CNC Router REVOLUTION ...
Page 21: ...20 1 2 3 4 ...
Page 23: ...22 The finished Z Assembly should look like this ...
Page 82: ...81 GR18 Right Gantry Side 1 GR20L GR20R Gantry Mid Vertical Support 2 ...
Page 85: ...84 M18 M6 Lock Nut 5 H9 20 X 2 Screw 1 H45 20 Wing Nut 1 H10 20 Nut 1 H75 Spacer 1 ...
Page 96: ...95 Completed Left Side ...
Page 100: ...99 Completed Right Side ...
Page 143: ...142 Completed Views Front View Back View ...
Page 144: ...143 Left Side Right Side ...
Page 145: ...144 Properly Wired Controller ...