35
Step 2
Hold the Assemblies together and carefully insert a Short Rail
through the Upper Rail Support, threading it behind the upper
SG20U Bearing as shown. Gently thread the Rod through the
Rail Support and behind the lower SG20U Bearing, through the
second Rail Support, finally seating the Rod into the Lower Rail
Support and Rail Stop Assembly
Rotate each Rail as you guide them through each of the
components. This will help them to slide smoothly into
place.
TIP
T
Summary of Contents for REVOLUTION
Page 1: ...Assembly Manual Rev 2 5 Rotating Axis CNC Router REVOLUTION ...
Page 21: ...20 1 2 3 4 ...
Page 23: ...22 The finished Z Assembly should look like this ...
Page 82: ...81 GR18 Right Gantry Side 1 GR20L GR20R Gantry Mid Vertical Support 2 ...
Page 85: ...84 M18 M6 Lock Nut 5 H9 20 X 2 Screw 1 H45 20 Wing Nut 1 H10 20 Nut 1 H75 Spacer 1 ...
Page 96: ...95 Completed Left Side ...
Page 100: ...99 Completed Right Side ...
Page 143: ...142 Completed Views Front View Back View ...
Page 144: ...143 Left Side Right Side ...
Page 145: ...144 Properly Wired Controller ...