Boann Reverse Osmosis 5-Stage Water Filtration System User Manual Download Page 17

17

boannstyle.com

Initiating the Water Filtration System

Opening All Water & System Valves

At this point, turn On all water and system valves to initiate the water filtration system. Proceed to 

turn On the Hot and Cold water valves and the filtration system’s Tank Ball Valve, located atop of 

the R.O. Pressure Storage Water Tank.

Flushing the Reverse Osmosis 5-Stage Water Filtration System

PLEASE NOTE: By turning the cold water shut off valve ON, water is effectively flowing through 

the system, thereby flushing the system of any and all loose particulates and carbon dust.

IMPORTANT: It is advisable to turn on the cold water tap on the kitchen faucet to make sure there 

are no leaks anywhere within the plumbing system. 

It is important to allow the water to run through the system for one (1) hour to initiate the Reverse 

Osmosis process and ensure proper system flushing. In that the R.O. Membrane is filled with food 

preservative for quality assurance, it is advisable to flush it out with water, along with the Post 

Carbon Filter and the Water Storage Tank’s bladder before water consumption.

R.O. Filtration System Installation

Tank Ball Valve - Open

Hot Water Valve

Cold Water Valve

Tank Ball Valve - Close

Turn Water Valve 

Counter-Clockwise 

to Turn On

Turn Water Valve 

Counter-Clockwise 

to Turn On

Summary of Contents for Reverse Osmosis 5-Stage Water Filtration System

Page 1: ......

Page 2: ......

Page 3: ...y premature system degradation After installation is complete and deemed successful please read the Recommended Filter Replacement Schedule section on page 19 and keep record on your calender when you...

Page 4: ...Adapter 9 The Auto Leak Detector Advantage 11 Re Activating the Auto Leak Detector 11 R O Filtration System Installation 12 Preparing the Discharge Water Drain Clamp 12 Prepare the R O Pressure Stora...

Page 5: ...ation process Parts Diagram 1 Parts Diagram 2 Parts Diagram 3 Package Contents Drain Clamp ACW 2 and Gasket Water Feed Connector AB 3 4 Auto Leak Detector Screws 5 Gal Pressure Storage Water Tank Fauc...

Page 6: ...LY Provided below are images showing the front and rear of the filtration system with filters intact We recommend to thoroughly read the installation instructions step by step in order to expeditiousl...

Page 7: ...Microfiltration Chlorine Odor Organic Chemicals Stage 3 Carbon Pre Filter Ultrafiltration Chlorine Bad taste Odor Stage 4 RO Membrane Filter Filters dissolved minerals salts and most harmful chemical...

Page 8: ...and determine the proper location for the unit and tank Please consider easy accessibility as it is required to periodically service the filtration system and its parts Tip Understanding installation...

Page 9: ...Turn the sink faucet On to make sure no cold water is flowing Next use a wrench to unscrew the cold water hose from the Cold Water Valve 2 If the white gasket is not attached to the EZ Angle Stop Adap...

Page 10: ...r end of the red PE Tubing to the R O System Out port on the Auto Leak Detector Next use the other cut red PE tubing and attach it to the Main Line In port on the Auto Leak Detector Installation Prepa...

Page 11: ...shut down due to a leak the replacement of the used cell will be required 2 To open the housing module simply pry the upper spring trigger with your hand or use a flat screwdriver to detach pry the up...

Page 12: ...ut the chosen spot with a 1 4 drill bit The 1 4 hole that is created into the chosen location on the drain pipe is where the black discharge line will be inserted and secured into place with the Disch...

Page 13: ...he Discharge Water Drain Clamp in its chosen location making sure the tubing is inserted into the drain pipe by 1 4 inch as shown 5 Assemble the two pieces of the Discharge Water Drain Clamp with use...

Page 14: ...ecurity apply 5 8 wraps of Teflon tape to the thread of the tank 2 The yellow PE tubing will now be used to connect the system to the R O Pressure Storage Water Tank Connect the yellow PE tubing into...

Page 15: ...2 hole in the sink or counter top or utilize an existing hole should it be the appropriate size 2 Slide chrome cover plate and rubber gasket onto stem of faucet and place the faucet onto the sink wit...

Page 16: ...ng hole should it be the appropriate size 2 Slide chrome cover plate and rubber gasket onto stem of faucet and place the faucet onto the sink with the stem going through the hole 3 Attach plastic loca...

Page 17: ...iculates and carbon dust IMPORTANT It is advisable to turn on the cold water tap on the kitchen faucet to make sure there are no leaks anywhere within the plumbing system It is important to allow the...

Page 18: ...Stage Water Filtration System please employ Teflon tape by way of wrapping the threads of the various threaded fittings 5 7 times This preventative measure will assist in preventing potential leaks f...

Page 19: ...O Membrane is rated for 4 000 5 000 Gallons of purified water production A new R O Membrane will last approximately 3 4 years However it is suggested replacing the R O Membrane every 2 years for syst...

Page 20: ...ent Filter Replacement Guide Step 1 Lift up filter approximately 30 degrees from R O filtration system Step 2 Twist filter counter clock wise and gently remove the filter from the filter housing Step...

Page 21: ...ard from the R O filtration system approximately 45 3 Grip the filter with one hand and proceed to unscrew the filter counter clockwise in a 1 3 rotation 4 At this point the filter should detach from...

Page 22: ...n 375 South 6th Avenue City of Industry CA 91746 Boann has the right at its discretion to replace or repair returned equipment Replaced equipment may be reconditioned Parts used in repairing or replac...

Page 23: ......

Page 24: ...Boann Specialized Stainless Steel Kitchen and Bath Hardware...

Reviews: