with as few tees and elbows as possible to give maximum supply volume.
An accessible shut off valve must be fitted on the supply line before the connection joint.
A suitable jointing compound which resists the breakdown action of LPG must be used
on every gas line connection.
For a DOUBLE UNIT, all gas connections must be made separately.
Check all connections for leakage. DO NOT USE A FLAME.
Note: All gas fitting on the oven, and supply must be by a licensed Gas Fitter.
ELECTRICAL CONNECTION
The ovens electrical supply is via a 2m cord set flex at the rear of the oven. For
immediate electrical supply , simply plug the lead into a properly earthed 3 pin socket.
WARNING - THIS APPLIANCE MUST BE EARTHED
If supply cord is damaged, it must be replaced by a suitably qualified person in
order to avoid a hazard.
VENTILATION
Proper ventilation is essential for good operation. It is important to have at least 100mm
(4") of air space around both sides and rear of the oven. It is also necessary to consider
a 300mm (12") space on the RH side to gain access to circuitry and gas connections
through the access panel. However, if space is limited the minimum of 100mm (4") must
still be maintained though the oven can be moved to gain access.
COMMISSIONING
Before leaving the new installation, check correct connections have been made, and that
the unit operates in accordance with the OPERATING INSTRUCTIONS.
Note: If for some reason it is not possible to get the appliance to function
correctly, then contact the supplier.
Note: Shut off the gas supply before any maintenance work is done on the
appliance.
INSTALLATION
-6-
Summary of Contents for Blue Seal G1100
Page 1: ...G1100 TURBOFAN OVEN...
Page 4: ......
Page 22: ...18 STACKING ASSEMBLY...
Page 23: ...19 CIRCUIT SCHEMATIC...
Page 24: ......
Page 25: ......