BLiNQ Networks Inc.
X-1200 System Installation Guide
Release 1.0
Confidential - Restricted Use and Duplication
Page
25
Issue 01 D1
Table 10 Recommended Torque Values for PSU Bolts
Item
Description
Torque
Note
1
Power supply nuts (M4x4)
2.7Nm or 2lbf-ft
Mount the PSU to the four (4) mounting
holes on the PSU bracket.
Figure 17 PSU Bracket PSU Mounting Studs
To install the power supply unit:
WARNING!
Always ensure that the power is OFF before installing this device.
Installation of the equipment must comply with local and national
electrical codes.
1.
Place the PSU on top of the four (4) raised studs on the PSU bracket. Position the PSU so that the AC
cable access is at the top and the DC output cable access is at the bottom.
2.
Place a lock washer on each of the PSU studs, then position and tighten the PSU nuts to the
specified torque. Follow the Torque setting from Table 9, “Recommended Torque Values for PSU
Bracket Bolts”.
3.
Route the AC cable to allow for adjustments when the unit swings up to fine-tune the alignment
angle, ensure that the cable provides sufficient movement so that the cable is not tight. Connect the
AC cable from the AC power source to the PSU AC cable using the desired connectors/method for
your installation.
On PSU:
Connect ACL (Brown) to AC Line (i.e., in USA - Black)
Connect ACN (Blue) to AC Neutral (i.e., in USA - White)
Connect Ground (Green/Yellow) to AC Ground
4 Mounting Studs
!