6.1 START UP THE INVERTER
6.2 INVERTER SHUTDOWN
When start up the three phase string inverter, should fellow below steps
:
Must follow below steps while shutting down the inverter:
6. STARTUP AND SHUTDOWN
Before starting the inverter, make sure that the inverter can meet the following conditions, otherwise it may result in fire
or damage to the inverter. In this case, we do not undertake any responsibility. At the same time, to optimize the system
configuration, it is recommended that the two inputs be connected to the same number of photovoltaic modules.
a) The maximum open voltage of each set of photovoltaic modules shall not exceed 1000Vdc under any conditions.
b) Each input of the inverter better use the same type of photovoltaic module in series.
c) Total output power of pv shall not exceed the maximum input power of inverter, each photovoltaic modules shall not
exceed the rated power of each channel.
1. First switch on the AC breaker.
2. Turn on the DC switch of the photovoltaic module, and if the panel provides sufficient starting voltage and power,
the inverter will start.
3. When the ac voltage and DC voltage are normal, the inverter start-up is readyto begin. The inverter will first check the
internal parameters and the grid parameters, while the liquid crystal will show that the inverter is self-checking.
4. If the parameter is within acceptable range, the inverter will generate energy. NORMAL indicator light is on.
1. Switch off the AC breaker.
2. Wait for 30 seconds, turn off the DC switch (if any), or simply disconnect the DC input connector. The inverter will close
the LCD and all LED within two minutes.