
Hymon
Fotowoltaika Sp z o.o.
ul. Dojazd 16A 33-100 Tarnów
Wyłączny dystrybutor nowoczesnych systemów
www.
hymon
.pl
15
Table 5.2 Cable information
5.2 AC INPUT TERMINAL CONNECTION
Do not close the DC switch after the DC terminal is connected.Connect the AC terminal to the AC side of the inverter, the
AC side is equipped with Three phase AC terminals that can be conveniently connected. Flexible cords are recommended
for easy installation. The specifications are as shown in Table 5.2.
Outside cable
(3+N+PE)20m
Cable CSA
Model
Cable outer dia
AWG
Breaker
Max cable length
BPT-V03-12-15
10
20-25mm
30A/400V
Warning:
Prohibit using a single circuit breaker for multiple inverters, prohibit the
connection of load between inverter circuit breakers.
The AC output connector is divided into three parts: matching socket, sleeve and sealingsleeve, as shown in picture 5.7,
the steps are as follows:
Step 1:
Remove the cable sealing ring and sleeve in sequence from the AC connector.
Step 2:
Use strippers to strip the protective sheath and insulation layer of the AC cable to the right length, as shown in
Picture 5.8.
Step 3: Insert the cable (L1, L2, L3, N
,
PE) into the sealing sleeve.
Warning:
Be careful to distinguish the L1, L2,L3,N and PE of the AC cables.
Pic5.8 Strip AC cable
8~15mm
40mm
1. Matching socket 2.Sleeve 3.Sealing core 4.Sealing nut
Pic 5.7 AC connector structure
1
2
3
4