Operating Instructions
500 E Global
Initial operation
6
Set the travel direction control joysticks to "forward" (working
direction). Select the speed using the drive speed control.
Fig. 5.2
When blast cleaning concrete the abrasive shot valve may only
be opened when the blast cleaning machine is travelling! If the
machine is at a standstill and the shot valve is open deep holes
may be blasted into the concrete surface within seconds.
When the machine is travelling, pull the abrasive control lever to
operate the valve. Observe the ammeter. It may indicate the full
load amperage (35 A).
Working direction
Summary of Contents for 500 E Global
Page 1: ...Operating Instructions 500 E Global MAN 500E Global EN REV 0...
Page 2: ......
Page 4: ......
Page 42: ...Operating Instructions 500 E Global Transport 4...
Page 50: ...Operating Instructions 500 E Global Initial operation 8...
Page 58: ...Operating Instructions 500 E Global Operation 8...
Page 72: ...Operating Instructions 500 E Global Maintenance 14...
Page 74: ...Operating Instructions EBE 500 E Electrical systems 2...
Page 75: ...500 E Global Operating Instructions Electrical systems 3 8 1 Electric circuit diagrams...
Page 76: ...Operating Instructions EBE 500 E Electrical systems 4...
Page 90: ...Operating Instructions EBE 500 E Electrical systems 18...
Page 96: ...Operating Instructions 500 E Global Fault diagnosis 6...
Page 97: ...500 E Global Operating Instructions Spare parts 1 Contents Chapter 10 10 1 Spare parts...
Page 99: ...500 E Global Operating Instructions Spare parts 3 10 1 Spare parts Fig 10 1...
Page 102: ...Operating Instructions 500 E Global Spare parts 6 Fig 10 3...
Page 106: ...Operating Instructions 500 E Global Spare parts 10...
Page 108: ...Operating Instructions 500 E Global Spare parts 12 Fig 10 7...