Operating Instructions
500 E Global
General
6
3.7 Control
box
The control box is equipped with all control elements and instruments
for monitoring and controlling the blast cleaning machine.
Fig. 3.3
1
Drive wheel joystick left
11 Control lamp “Fan”
2
Left motor “STOP”
12 Ammeter
3
Drive speed control
13 Main switch
4
Tracking control
14 Control lamp voltage
5
Right motor “STOP”
15 Control lamp “Main blast”
6
Drive wheel joystick right
16 Push button “Fan ON”
7
Emergency shutdown switch
17 Push button “Main blast ON”
8
Push button “Drive OFF”
18 Push button “Fan OFF”
9 Push button “Drive ON”
19 Push button “Main blast OFF”
10 Control lamp “Drive”
20 Hour counter
Main
switch
The main switch is located on the main box at the front of the machine.
It has to be switched on before operation.
Summary of Contents for 500 E Global
Page 1: ...Operating Instructions 500 E Global MAN 500E Global EN REV 0...
Page 2: ......
Page 4: ......
Page 42: ...Operating Instructions 500 E Global Transport 4...
Page 50: ...Operating Instructions 500 E Global Initial operation 8...
Page 58: ...Operating Instructions 500 E Global Operation 8...
Page 72: ...Operating Instructions 500 E Global Maintenance 14...
Page 74: ...Operating Instructions EBE 500 E Electrical systems 2...
Page 75: ...500 E Global Operating Instructions Electrical systems 3 8 1 Electric circuit diagrams...
Page 76: ...Operating Instructions EBE 500 E Electrical systems 4...
Page 90: ...Operating Instructions EBE 500 E Electrical systems 18...
Page 96: ...Operating Instructions 500 E Global Fault diagnosis 6...
Page 97: ...500 E Global Operating Instructions Spare parts 1 Contents Chapter 10 10 1 Spare parts...
Page 99: ...500 E Global Operating Instructions Spare parts 3 10 1 Spare parts Fig 10 1...
Page 102: ...Operating Instructions 500 E Global Spare parts 6 Fig 10 3...
Page 106: ...Operating Instructions 500 E Global Spare parts 10...
Page 108: ...Operating Instructions 500 E Global Spare parts 12 Fig 10 7...