![Blankom IRD-6100 User Manual Download Page 9](http://html1.mh-extra.com/html/blankom/ird-6100/ird-6100_user-manual_2769563009.webp)
BLANKOM IRD-6100 HD IRD User Manual
BLANKOM_IRD-6100_User_Manual_RR-V1.1-03-2018.doc
- 9 -
12
Audio (L/R channel) output interface
YPbPr: Audio and Video component output interface
13
Web-Interface NMS Ethernet Port (10-100Mbps)
14
Balanced audio output interface
15
Integrated power switch and socket
16
Grounding Wire connection
Chapter 2 Installation Guide
Accessories
When you open the package of the device, it is recommended to check delivered items
according to the packing list. Normally it should include the following items:
BLANKOM IRD-6100 HD IRD 1 pcs
User’s Manual
(optional as download PDF)
1 pcs
ASI Cable BNC-BNC 1 pcs
Power Cord
depending on country
1 pcs
If any item is missing or mismatching with the list above, please contact our sales rep.
Installation Preparation
When users install device, please follow the below steps. The details of installation will be
described at the rest part of this chapter. Users can also refer rear panel chart during the
installation.
The main content of this chapter including:
Checking the possible device missing or damage during the transportation
Preparing relevant environment for installation
Installing modulator
Connecting signal cables
Connecting communication port (if it is necessary)
Environment Requirement
Item
Requirement
Machine Hall
Space
When user installs machine frame array in one machine hall, the distance
between 2 rows of machine frames should be 1.2...1.5m and the distance
against wall should be no less than 0.8m.
Machine Hall
Floor
Electric Isolation, Dust Free
Volume resistivity of ground anti-static material: 1x10
7
...1x10
10
,
Grounding current limiting resistance: 1M
(Floor bearing should be
greater than 450Kg/
㎡
)
Environment
Temperature
5...40°C
(sustainable )
,
0...45
°C
(short time)
,
installing air-conditioning is recommended