BLACKBERRY RADAR R2 ITE100-1 INSTALLATION GUIDE
DRY VAN, INSULATED TRAILERS (BARN DOORS)—CARGO PERCENTAGE
49
3.
Locate the “Side Mount” Install template that came with the 20° bracket. Remove the
liners from the rear of the template and place the template on the wall. The adhesive
ensures the template stays on the wall for accurate drilling of your holes.
It is recommended that you install the module as level as possible on the asset. To help
ensure the module is straight, you may try one of the following techniques.
Technique 1:
Using a square or level, confirm the door frame is perfectly vertical
(perpendicular to the floor). If the door frame is perfectly vertical, align the rear of the
module to the front edge of the door frame
Technique 2:
Visually, align the dotted line near the bottom of the template to the mark
you created on the wall. Using a square or level, confirm that the template is level, and
the bottom edge of the template is parallel to the floor.
Mark
Door
Frame
Liners