724-746-5500 | blackbox.com
Page 65
Chapter 6: Operation
6.7.2 Monitor Inline
Move the cursor to MONITOR INLINE and press SELECT if you
wish to view the negotiated results between two LAN devices.
NOTE: Data communication can take place while the Main Unit is
inline between two devices but after the negotiation is
complete.
The MONITOR INLINE TEST is methodical and mostly automatic.
Here is a summary of the steps that allow the LPV to arrive at the
negotiated speed (detailed steps are on the next page):
1. Plug in one PORT to the LEFT SOCKET of the LPV.
2. Pause for a few seconds and then plug the second PORT into
the RIGHT SOCKET.
3. The LPV displays the negotiated speed.
NOTE: If you suspect one of the devices has PoE, plug it into the
RIGHT jack.
Screen-by-screen instructions to perform INLINE testing.
Follow the steps and wait for the LPV directions. The tester will
tell you when it is time for the next step.
UNPLUG ALL PORTS. When the LPV senses that no ports are
connected to the tester, it will begin.
Figure 6-75. Unplug all ports screen.
PLUG IN 2 PORTS. Plug in both devices using the “LEFT” and
“RIGHT” sockets of the LPV.